Meeting with Director(HR) and HR vertical PGMs by BDM Leaders on 14.07.2025 :

Meeting with Director(HR) and HR vertical PGMs by BDM Leaders on 14.07.2025 :

In line with another communication from BSNL Management , the BDM leaders had a meeting with Director HR and PGMs (Pers, Estt & SR) to discuss various important issues.

The brief of discussions which took place are as below:

Superannuation Benefits & PRMB:

It is intimated that management has formed a committee to look into the matter raised by BDM. The committee is expected to finalize its report and conclude maximum within this week. It was conveyed to BDM that management understands the genuineness of this issue and they are very much considerate on extending the relief and resolution of this long pending issue which pertains to the social security of the BSNL Recruits.

Escalation of E2 E3 Matter to DoT:

The communication from BDM for implementation of E2-E3 pay scales for implementation of standard pay scales has been forwarded to DOT for further action and decision. BDM is pursuing for another tripartite meeting with DoT, BSNL and BMS Association & unions.

Implementation of 3rd PRC and conclusion of wage negotiation agreement:

It was informed that the wage negotiation committee has finalised the report. The calculation of financial implication with respect to extending different slabs of fitment has been submitted for concurrence and decision by the competent authority. Management side assured that this issue will be concluded with positive resolution in next few days.

Pay Loss issues:

It is informed that Committee has been constituted for checking the concerns. Other pay loss issue pertaining to JE Period are being looked into by the Wage Negotiation Committee official side.

Promotions in Various Cadres:

Management suggested to have a common approach in this regard from all stake holders. Management proposed for detailed meetings to discuss the implementation of promotions in all cadres which is scheduled to be held on 15th or 16th with PGM Pers and his team. All the possible ways were assured to be explored for Promotions to the eligible executives across various streams and cadres. The necessary action shall be taken after the meeting.

Pay Scales of JEs:

The pay scales of JE were discussed, and the request made by BDM was shared with the Pay Revision Negotiation Committee to incorporate for deliberations. The necessary changes based on the suggestions of BDM especially wrt JE pay scales have been taken into consideration by the committee and the same has been incorporated in the wage negotiation report.

Transport allowance:

The up gradation of Transport allowance will be done to the best possible level based on recommendations of committee. The same is likely to be concluded within one week.

TA/DA and Removal of DA freeze on Medical reimbursement:

Conclusive discussions on TA/DA revision and unfreezing of medical reimbursement DA rates from that of April-2020 will also be concluded by this weekend with best possible efforts to extend relief to the employees.

Asset Ambassador Proposal:

The issue of asset management was discussed, and it has been modified from compulsory to volunteering. This change is expected to bring more flexibility and ease the burden on employees. Management has agreed to the demand of AIGETOA to do away with any forceful implementation of the asset ambassador and made it voluntary.

Operational 3-Tier Structure:

Management informed that the proposed 3-tier structure has been designed as per operational requirements and the same is still in POC stage. Management assured that they are open to suggestions from BDM in this regard. Final rollout and further refinements will be done based on the feedback from the stakeholders especially with regard to the inputs of Bharatiya Doorsanchar Manch.

Attendance App:

Director HR said that BDM may submit its suggestions to improve the attendance app and take care of the concerns raised, taking into account the requirements of field officers and officials, as well as BSNL’s needs. He assured that management is open to all feasible solutions. BDM forum assured that they will submit its suggestions in this week itself for further consideration.

Sabbatical Leave:

Management side informed that the proposal for sabbatical leave has been put up for approval, and that it will be cleared soon. BDM forum welcomed the same

Death Relief Fund:

It was intimated that as per assurance given to AIGETOA and BDM, the report for the Death Relief Fund are under finalization and are expected to be submitted this week.

Organisational Activities:

PGM SR advised that associations should not engage in agitation activities. The BDM leaders were requested to withdraw such activities immediately and were assured that management is working on all the issues with a positive frame of mind intended towards finding the resolution of the issues to the best possible extent.

The meeting concluded with a request to withdraw agitation, assuring outcomes as per rules and administrative timelines. The BDM leaders requested to address the concerns and look forward to positive outcomes. It was communicated that its been many days but still the things have not taken a concrete shape. However, It was conveyed to management that the outcome of the today’s meeting shall be shared transparently to all the stake holders and office bearers down the line.

(Team Bharatiya Doorsanchar Manch)

Massive Response to BDM Twitter Campaign – United We Stand for BSNL !!

Dear BSNL Colleagues,

On behalf of Bharatiya Doorsanchar Manch (AIGETOA, BTEU BSNL, BDPS, STEWA, AIBSNLOBCEA, FNTOBEA, BTU), We extend our sincere thanks to all the employees of BSNL for supporting today’s twitter campaign launched by BDM by cutting across the association and union lines.

The total tweets supporting the campaign has crossed 70K tweets(Still Continuing) and the #SaveBSNL #OperationSankalp #SaveSwadeshi4g has been trending at Number #1 alternatively, in twitter trends under telecom and business news for the whole campaign period from 3.15 PM to 5.45 PM and even kept trending till late hours.

The support extended by the employees to the programs launched by Bharatiya Doorsanchar Manch is a testament to the unity and the common thought process of employees. We once again take this opportunity to appeal all Unions and Associations of BSNL to support the cause and make this program more stronger.

Further, this is to inform you all that the twitter program of tomorrow is being rescheduled to be held on 16th July 2025 from 3 PM to 4.30 PM. With your support and participation, we are very sure that this time that the count will double and reach at least 1.5 lakhs.

We once again extend our thanks to all the BSNL Colleagues for the successful conduction of today’s twitter campaign.

The next program is silent protest in Lunch Hours and Closing hours on 15th July 2025. We once again solicit your support for making the program even more successful.

Together we will win definitely.

Submission of Memorandum to Hon’ble MoC, Hon’ble MoSC by CHQ & Hon’ble Governors of the State, Hon’ble MPs of the Area, Hon’ble Ministers by respective CSs/DSs (10th July 2025 to 20th July 2025)

Submission of Memorandum to Hon’ble MoC, Hon’ble MoSC by CHQ & Hon’ble Governors of the State, Hon’ble MPs of the Area, Hon’ble Ministers by respective CSs/DSs.

(10th July 2025 to 20th July 2025)

Program of Bharatiya Doorsanchar Manch (BDM) – Activity to be performed:

Submission of Memorandum in support of the demands raised by BDM to Hon’ble Minister for Communications by CHQ, Hon’ble Minister of State for Communications by CHQ, Hon’ble Governors of the State, Hon’ble MPs of the Area, Hon’ble Ministers by respective CSs/DSs.

Click here for Memorandum to Hon’ble MPs & Governors

All Circle Secretaries/District Secretaries upto OA Level, ensure the submission of above memorandum to seek the kind intervention of the, Hon’ble Governors, Hon’ble Members of Parliament (MPs), and other concerned dignitaries for resolving the critical issues affecting BSNL’s revival, execution of projects of national importance, and long-pending HR issues of BSNL Executives and Employees.

Activity Details

✅ STEP-1: Visit and Submission of Memorandum

All CSs, DSs, and members are requested to:

1] Personally visit the Hon’ble MPs of their constituencies and Hon’ble Governors of their states.

2] Submit the memorandum on BDM (Bharatiya Doorsanchar Manch) letterhead highlighting the key issues and appeal for their support.

3] Ensure proper documentation of the visit with photographs during the submission.

📄 Click Here for Memorandum to Hon’ble MPs & Governors

📄Click Here for the List of MPs (Rajya Sabha & Lok Sabha)

📄Click Here for the List of State Governors

✅ STEP-2: Uploading Detail

After the submission, all concerned office bearers are requested to:

  • Upload details of their visit (Date, Name of Hon’ble MPs/Governors etc.) in Google Form.
  • Attach photos of submission on the Google Form link provided.

📤 Click Here to Upload Details of Visit to Hon’ble MPs Lok Sabha

📤 Click Here to Upload Details of Visit to Hon’ble MPs Rajya Sabha

📤 Click Here to Upload Details of Visit to Hon’ble Governors

⚠️ Important Instructions for All CSs & DSs:

  • Coordinate and plan visits effectively to ensure maximum outreach during the campaign period.
  • Present the memorandum in a humble and respectful manner with a clear appeal for intervention.
  • Highlight the national significance of BSNL and the urgent need for resolving HR and operational issues.
  • Strictly adhere to the timeline: 10th July 2025 to 20th July 2025.

Let’s unite for the cause of BSNL and raise our collective voice to ensure timely intervention and revival of the telecom PSU.

Together, let’s strengthen BSNL – A Nation’s Asset!

Update on Meeting of Bharatiya Doorsanchar Manch with CMD BSNL – 10th July 2025

As informed earlier, Team AIGETOA representing Bharatiya Doorsanchar Manch (BDM) had a detailed meeting with CMD BSNL on 10th July 2025 at 6:30 PM. The meeting was also attended by Director (HR). The purpose of the meeting was to review the status of long-pending issues raised by BDM through its notice served more than two and a half months ago.

During the meeting, Director (HR) shared the status on various issues raised by BDM. However, it was clearly observed that despite ongoing discussions, there has been no tangible progress. The HR group appears to be operating with a purely theoretical approach and lacks a resolution-oriented mindset. We categorically conveyed to CMD BSNL that the delay in resolving the issues reflects a lack of seriousness on the part of the HR team and the same is the major cause of the current unrest.

We expressed our deep concern over the fact that even after repeated assurances and more than 75 days since the notice, most of the key issues remain unresolved and stuck at the discussion level. CMD BSNL reiterated his assurance to look into the matters with a holistic approach, but once again, no concrete resolution has emerged so far.

The matter of Attendance App upgrade and the controversial Asset Ambassador orders was also discussed in detail. The same will be discussed with PGM Admin and PGM Restg next week in presence of Director HR. We strongly demanded that these orders be kept in abeyance until a thorough review of the orders are done. The issue of pending OTP cases and non-consideration of genuine requests related to retention, modification, and cancellation was also raised. In response, CMD BSNL asked us to submit the list of such pending cases to Director (HR) for necessary action.

After the meeting, Team BDM undertook an internal review of the developments and concluded that the HR group is not showing any real intent to resolve the issues. Instead, it appears they are only trying to buy time. If the intention had been genuine, the time already spent in discussions could have been utilised to provide concrete and conclusive solutions.

In light of the continued apathy and absence of actionable results, Bharatiya Doorsanchar Manch has decided to continue with its announced organisational action programs. Accordingly, the Memorandum Submission program and the Twitter Campaign will commence from 11th July 2025. The hashtag and format of the Twitter campaign will be released at 12 noon, and the campaign will run between 3 PM and 4 PM.

We appeal to all members of Bharatiya Doorsanchar Manch to gear up for the next phase of our collective struggle. Your active participation and united voice will be the key to achieving justice and rightful resolution of our long-pending demands.

Activity of 11th July 2025 :

  • Memorandum Submission to Hon’ble MPs, Governors, and MoC begins tomorrow.
  • Twitter Campaign

Hashtag and post format to be released at 12 Noon.

Campaign timing : 3 PM – 4 PM.

Together We Will Win!

Update on Review Meeting with Director HR and Decision on Twitter Campaign & Memorandum Submission

In continuation of appeal by BSNL Management, Today Team BDM was called by Director HR for a review meeting on the progress made on the issues raised by Bharatiya Doorsanchar Manch. Director HR informed about the status and told that issues have made decent progress and requested us to withdraw the agitation. However, upon detailed examination of the status report, BDM found that while some movement has taken place, the progress is still far from yielding any tangible outcome. Several key concerns remain unaddressed.

During the meeting discussions were also held on the recent orders issued with respect to the Asset Ambassador and Instructions on upgradation in the attendance portal. BDM raised strong objections to the recent orders issued. Director HR assured to review the same and agreed to initiate fresh discussions on the matter. BDM firmly reiterated that orders must first be held in abeyance before any talks are initiated. The issue of pending OTP and non consideration of many genuine retention/modification and cancellation requests was also discussed. Director HR told us to submit the list of such genuine left out cases.

Since, we didn’t see any appreciable output on the issues, BDM conveyed its inability to defer the organisational programs under the current circumstances.

Following the meeting, GS held a telephonic discussion with CMD BSNL, apprising him of the situation and lack of concrete progress. It was informed that BDM shall continue with its planned activities. Subsequently, a meeting with CMD BSNL has been scheduled for the evening of 10th July 2025 to assess the genuineness of the management’s intent in resolving the long-pending issues.

Dear Friends,

As a gesture of goodwill and to allow space for constructive dialogue, BDM has decided to postpone the Twitter Campaign by one day, i.e., from 10th July to 11th July 2025. The Memorandum Submission Program shall also commence from 11th July 2025.

We understand the inconvenience and disappointment this may cause to our office bearers and members, but as a responsible platform, BDM believes in exhausting all options for an amicable resolution.

Let us continue to stay united and strong in our pursuit. Future course of action shall be announced based on the outcome of the meeting with CMD BSNL.

BDM Submits Revised Schedule of Organizational Action Programs (29.06.2025)

Bharatiya Doorsanchar Manch (BDM) comprising AIGETOA, BTEU, BDPS, AIBSNLOBCEWA, STEWA, FNTOBEA, and BTU has submitted a revised schedule of Organizational Action Programs to BSNL Management in response to the unfulfilled assurances on demands.

Click here for the letter to BSNL

Despite multiple rounds of discussions with Director (HR) and a comprehensive meeting chaired by the CMD BSNL on 23.06.2025, no firm written assurance or tangible actions have been taken on long-pending issues like standard pay scales, promotions, SAB, perks & allowances, pay losses, and 3rd PRC.

BDM has expressed disappointment over the continued inaction, arbitrary transfers, and non-resolution of legitimate requests.

📅 Revised Schedule Organization Action Program :

10-12 July 2025: X (Twitter) Campaign – “Save BSNL, Save the Swadeshi 4G”.

15 July 2025: Black Shirt Silent Protest.

21 July 2025: Digital Protest Wall & Reverse Review Submission.

25-26 July 2025: Press Conferences & Black Badge Protest.

31 July 2025: Human Chain or Pad Yatra.

5-6 August 2025: Dharna & Prayer for Departed BSNL Colleagues.

7 August onwards 2025: Quit WhatsApp/Telegram Groups, Work as per Rule.

12-13 August 2025: Twitter Campaign for 3rd PRC & Affordability Clause Waiver.

19 August 2025: Betrayal Day – Silent Dharna.

27 August 2025: One Day Mass Leave.

1-2 Sept 2025: Hunger Fast across BSNL.

10-12 Sept 2025: Delhi Chalo – 3-Day Dharna at BSNL CO.

BDM firmly reiterates that without time-bound resolutions on key issues, the agitation will continue and intensify.

Update on BDM Forum Discussions with CMD BSNL and Senior Management – 22nd June, 23rd June 2025 & 24th June 2025 :

A detailed meeting was held on 23rd June 2025 under the chairmanship of CMD BSNL, with the participation of Director (HR), senior HR officials, and leaders from the BDM Forum including AIGETOA and BTEU. This follows earlier detailed discussions with Director (HR), PGM (Pers), PGM (Estt) and PGM (SR) wherein the minutes and appeals were issued earlier. The meeting lasted for almost 2 hours wherein threadbare discussions on the issues raised were done. Discussions of the Forum leaders was also held with Director (CFA), Director (Finance), PGM (Restg) on the issues raised vide part-A of the charter of demands on which a separate update shall be circulated.

1] The key takeaways of the meeting and discussions so far:

CMD BSNL has appreciated the concerns raised by Forum Leaders and acknowledged that the issues raised especially those pertaining to the Social Security like 30 % Superannuation Benefits, PRMB and Death Relief Fund deserve attention going beyond the boundaries of affordability and in the larger perspective of a secure future for the dependents of the employee also. The assurance that management will take efforts to ensure that the contribution is raised to a significant proportion and the directions to the HR team to examine the possibilities in a time bound manner with reference to the rules and guidelines submitted by the BDM Leaders is definitely a welcome gesture but only if tangible output is visible in the form of recommendations.

Management has also finally agreed to take up the issue of replacement of E1A and E2A by the standard pay scales of E2 and E3 and that of 3rd PRC with DoT in reference to the submissions made by Bharatiya Doorsanchar Manch. This is indeed another welcome change that after two long years, finally management has agreed to the request of the Bharatiya Doorsanchar Manch.

Management has also assured for the finalisation of the recommendations of the wage negotiation committee within next few days. Management side also gave a patient hearing on the subject in the exclusive meeting of the BDM representatives with the chairman and the members from the management side of the wage negotiation committee. In-depth discussions on the submissions of BDM with respect to the wage negotiation of the non-executives with special emphasis to finalisation of JE Pay Scale (NE-9) as 35400 as minimum basic was held with the wage negotiation committee. The residual issue of JE Period Pay Loss was also highlighted before the Committee Members which was reciprocated well.

A positive gesture with respect to extending the mobile handsets to the JEs in the field units was also shown by Management. The issue of E1 plus 5 increments is to explained once again to the Establishment cell.

2] On the issues related to the viability, management side had conducted detailed meetings with vertical directors and Forum leaders have deliberated the issues with the concerned team. On the issue of Swadeshi 4G, BDM appreciated that the indigenous system in place is big achievement not only for BSNL but also for the entire nation. At the same time, the recurrent issues pertaining to the indigenous 4G/5G network which are resulting in the churn of subscribers and the loss of revenue / profitability of BSNL must be taken care of was the demand of the forum. Management side informed that they are open to all feedback/suggestions from the BDM Forum and assured action on the issues submitted by the leaders in the meeting.

3] In the various meetings with CMD BSNL, vertical directors and the nodal officers on the issues raised by BDM, we have submitted our feedback on the critical concerns pertaining to the 4G/5G network, FTTH issues, Maintenance issues, vehicles unavailability, backhaul issues, issues related to the viability of the places chosen for installing the towers etc. and we expect that a time bound resolution shall be extended for the same. We are looking forward to meeting with Director (Enterprise), Restructuring Cell and the nodal cell dealing with the recommendations of the COPU in the next week.

4] Point wise developments and the status on date as per assurances given in the meetings with CMD BSNL and Director (HR) in presence of PGMs from HR group is as stated below:

a) BSNL Viability related issues: As per Para 3 and 4 above.

b) Implementation of 3rd PRC and Finalisation of Wage Negotiation: The Forums submission with respect to the affordability waiver for BSNL shall be taken up with DoT. The Wage Negotiation Committee shall be asked to submit the report in next few days.

c) Delinking of Pension Revision with Profitability of BSNL and Implementation of Hon’ble PCAT judgement: Issue Pertains to DoT and accordingly Forum leaders were asked to pursue at an appropriate forum.

d) One Company, One Policy for all the employees in BSNL: The Committee formed for the purpose viz Perks and Allowances for Executives and Non- Executives (Increase in Children Education Allowance, Professional upgradation allowance/skill upgradation allowance, Festival Allowance etc), TA/DA Revision and Monthly Transport is in the final stage of submission of the report and the same shall be submitted within 7-10 days.

g) Creating the mandatory PRMB fund: Establishment cell has been directed to examine the matter and submit the same to CMD BSNL for further discussions with the Forum Leaders.

h) Creation of Death Relief Fund: The gravity of the issue raised by BDM in the backdrop of untimely demise of the employees of BSNL was acknowledged by the management side. It was assured that issue shall be given a positive consideration by arranging the necessary funds.

i) Settlement of the Pay-Loss issues (22820): The Revised Committee with the replaced members shall be immediately notified to examine the inputs submitted by Forum and submit the recommendations. The issue of JE period pay loss for the JEs promoted as JTOs have further been discussed with the Wage Negotiation Committee Members from management side as a residual issue of 2nd PRC.

j) The Demand of the Forum to provide Mobile handsets to the JEs shall be examined for reconsideration by the Management Committee.

k) Fixing the appropriate JE Pay Scale and revision of NEPP for Non-Executives: The issue of JE Pay Scales (2nd & 3rd PRC) was discussed with the management side of the wage negotiation committee and the inputs of the BDM has been noted. The wage negotiation committee shall be asked to finalise the report in next few days. The submissions of the BDM for revision in NEPP has been discussed with Establishment cell and the inputs of the Forum has been noted.

l) Redressal of the stagnation issues pertaining to the employees of BSNL: The issue has been referred to the wage negotiation Committee.

m) Restoration of medical Coverage: The case for increasing the limit cannot be considered as of now due to financial constraints. However, BDM’s request for calculating the limit on the current DA rates shall be given positive consideration expeditiously.

n) Promotions for all eligible executives and non-executives: Concerned section has been asked to explore the options by convening the meeting of all the stake holders.

The forum suggestions for ensuring the promotions of all eligible to be examined with a positive perspective.

The forum suggestions of doing away with the proposed three tier hierarchy and replacement with a model which can be implemented in the existing framework of the post-based promotions was also noted and assured to be examined with a positive perspective. In fact, the proposal of the BDM if agreed will ensure promotions from JE to JTO, JTO to SDE, JAO to AO, SDE to AGM and AO to CAO within the ambit of existing framework without disturbing the reservation guidelines as well as the government of India rulings on the subject. If the stay on DGM promotions is vacated, DGM Promotions can also be held.

Further, the committee for deliberating and recommending on the List 12 and 13 seniority issue was also asked to submit its report maximum within 2 weeks. Similarly, the pending PWD promotions was also to be expedited.

A meeting shall be held next week with PGM Pers on the promotional issues.

Forum was asked to take all efforts to settle the legal cases and bringing all to a common understanding to minimise the litigations.

o) Implementation of E1 instead of NE12: Highest Non-Executive scale has to be below the lowest Executives scale. Hence, the issue is being referred to the Wage Negotiation Committee for examination.

p) Intervention at highest level with EPFO authorities to ensure that the EPF higher pension options of BSNL Executives are accepted: The case will be looked into and the needful directions shall be passed on to the circles by next week. Director (Finance) has assured to take up the matter with the Central Provident Fund Commissioner.

q) Granting one time option to be covered under the CCS (Pension) rules 1972 for the executives and non-executives whose recruitment process was initiated notified by DoT before formation of BSNL: The issue pertains to DoT and the earlier submissions of Unions and Associations including AIGETOA & BTEU BSNL have been forwarded to DoT already.

r) Starting the welfare activities : Management agreed to give a positive consideration.

s) Consideration of modification requests, retention on immunity grounds (12th Class, Self PWD/Care giver, Self-Medical /Care giver, Consideration of choice circles only, violation of transfer policy and Association immunity), issuance of Transfer orders of executives completing hard tenure and issuance of OTP orders of the executives back to their parent circles: The cases highlighted by the association have been noted. The management side has assured that all the genuine requests are under consideration and the same shall be issued soon. The remaining OTP cases including for those displaced in long stay shall also be considered in a phased manner. The Tenure orders shall be issued immediately.

5] Management side’s assurance that all necessary steps will be taken to address the issues raised by the BDM Forum as stated above is definitely a positive step but at the same time, management is reluctant on issuance of minutes as some corners have objected on the same. Instead of the minutes, they have issued an appeal which is more of a generic nature but reflects positive thoughts.

Click here for the Appeal

6] Management has desired that the forum must give some time to them by postponing the action programs for delivering a tangible outcome on the issues as stated above especially with respect to the 30 percent SAB contribution, Perks and Allowances including the increase in monthly transport allowance, Promotions of all eligible including the settlement of seniority issue of List 12 & 13, Taking up the standard Pay scale & 3rd PRC issues with DoT in the next 10-15 days. We also hope that the wage negotiation committee shall be concluding their discussions and submit the recommendations within next few days.

7] The discussion with the CMD BSNL, Director HR and the HR team on dated 23.06.2025 has definitely ignited another ray of hope for us but is not the way forward till it attains finality in terms of the tangible output. It’s good that the head of the organisation himself has extended assurance and directed the concerned cell to act on the issues in a time bound manner with holistic consideration categorically in the meeting. If management is serious in its approach, we believe that tangible output as a result of these discussions will be visible in next 10-15 days.

8] However, in the absence of the immediate confidence building measures and output in the form of finalisation on the issues especially those pertaining to Pay Scales, Promotions for all eligible, Perks and allowances, 30 Percent SAB, BDM cannot take a call on withdrawing the programs. We do believe that mutual dialogues can only resolve the issues but intent of resolution must be there. All the positivity created vanishes when we see the actions which have been taken post these meetings in this week.

The actions taken in last few days appear to be on the contradictory side especially with respect to issues like unilateral orders on network ambassadors, which in fact is a gross violation of employee rights and additional check on existing hierarchy. Then another significant orders where management has categorically assured positive action was with respect to the resolution of the 147 reversal orders. Despite assuring to resolve the 147-reversal issue in positive, management has issued a speaking order which is negating the resolution of this seniority dispute. In this scenario, it becomes difficult to assume that management will settle the other seniority disputes in a positive manner.

It is very clear that pers section is acting on the advice of few officers who have been holding the key sensitive posts on rotational basis by rotating the chairs from one sensitive post to other in complete contravention to the CVC guidelines. Till these officers are there, there cannot be any respite to the seniority disputes as most of them are the root cause of all these complexities in HR Matters. Additionally, rumours of execution of further mass transfers through a new unilateral transfer policy – which may cause further unrest and are completely unacceptable to the Forum. Added to that non-issuance of retention, cancellation, modification and tenure completion orders despite assuring on a daily basis and whole week being passed after meeting creates doubts even if we want to move forward with positivity.

Management always advocates about meritorious employees for which it, itself devised limited internal examinations. But completely failed to safeguard the interest of these employees, first in 2020 by the then CMD, snatched their rightful seniority. And this time management snatched the chances of promotions for many LICE qualified AGMs by throwing them far away from their existing circles in complete contravention to the rules and guidelines and by ignoring their grievances and genuine compelling reasons. For the First time in the history, persons have been penalised for passing the exam in the form of withholding of EPP and nothing can be more shameful than this. These 19 officers should not consider themselves alone. AIGETOA stands firmly with them and assures to take all actions to nullify this injustice. We are exploring the legal options as well.

The attendance portal update which apparently has made the handsets vulnerable was also not required but the same has been done as if putting multiple checks on the employees is the only priority for the management. No one is afraid of such checks but it definitely exposes the actual intent. Had so much focus would have been given to the operational and HR issues, such type of action programs by various forums would have never been required.

9] Hence before any such consideration of postponement/withholding of the organisational action programs, management has to come up with concrete confidence building measures. Since few programs have been put on hold, rearrangement in the action program and publication of a revised schedule is also a necessity. Accordingly, Forum shall be holding a meeting with all the circle representatives in the weekend to discuss the next course. Dialogue with management will continue, but so will our preparedness for action. A revised schedule for the resumption of action programs shall be circulated.

Operation Sankalp: United for Change, Driven by Purpose :

Operation Sankalp: United for Change, Driven by Purpose. Click here for Complete Video

A Heartfelt Note of Gratitude

Respected Friends and Colleagues,

With great joy and pride, we share that the third phase of our nationwide organizational action plan has been completed with resounding success. This achievement belongs to each and every one of you – to your tireless dedication, unwavering unity, and unshakable spirit.

“Operation Sankalp: United for Change, Driven by Purpose” is more than just a slogan; it is the heartbeat of our collective journey. It stands as a testament to the power of solidarity, shared purpose, and the unbreakable bond that connects us.

On behalf of the Bharatiya Doorsanchar Manch, we offer our deepest gratitude for your active participation and steadfast support. Your presence and passion have been the driving force behind every step we’ve taken.

Our Fight for Right Continues – the road ahead may still hold challenges – but with your continued strength and solidarity, we are confident that we will reach our goals, together.

At the same time, we continue to engage in dialogue with the management. For us, the path forward is built on both conversation and conviction – the willingness to talk, and the courage to stand firm for what is right.

Thank you, from the bottom of our hearts, for standing with us – today and always.

In solidarity,

Ravi Shil Verma / R C Pandey

Chairman / Convener

Bharatiya Doorsanchar Manch

Glimpses of Lunch Hour Demonstration of Bharatiya Doorsanchar Manch on 19th June 2025 across the Country :

The Lunch Hour Demonstration organized by Bharatiya Doorsanchar Manch (BDM) on 19th June 2025 witnessed massive participation from BSNL employees across the length and breadth of the country. The demonstration was conducted at BSNL offices in every district and circle, reflecting the collective voice of employees demanding long-pending HR resolutions and ensuring a time-bound roadmap for BSNL’s revival.

Glimpses of Lunch Hour Demonstration Zone wise across the Country as below :

North Zone – Glimpses of LHD held on 19.06.2025. Click here Pictures

South Zone – Glimpses of LHD held on 19.06.2025. Click here Pictures

Central Zone – Glimpses of LHD held on 19.06.2025. Click here Pictures

East Zone – Glimpses of LHD held on 19.06.2025. Click here Pictures

West Zone – Glimpses of LHD held on 19.06.2025. Click here Pictures

Full Glimpses of Lunch Hour Demonstration. Click here